16Mar/090
DN3DS – WIP Update 02
Another little update. By now, I've started the second floor, although I'm not done with the bathroom on the bottom floor, but I want to make some progress on the second floor first, so the connection between them turns out okay.
You DO remember the secret passage between the two, right?














